Trackwatch

A DIGEST OF THE MAIN CHANGES ON NETWORK RAIL, LONDON UNDERGROUND AND NORTHERN IRELAND RAILWAYS INFRASTRUCTURE DURING MARCH 2019; COMPILED BY MARTYN BRAILSFORD OF THE BRANCH LINE SOCIETY (WWW.BRANCHLINE.UK).

March has seen a number of signalling re-controls – Bowesfield Junction, Port Talbot Phase 1 and the Highland main line (Pitlochry & Aviemore) and unusually a minor re-control from a new signalling centre to a humble signalbox! The revised Up Reception Sidings at Buxton have been commissioned as has the new Lea Bridge Junction.

Want to read more?

This is a premium article and requires an active subscription.

Existing subscriber? Sign in now

No subscription?

Pick one of our introductory offers