PHILIP SHERRATT
UPDATED TIMETABLE: Final preparations take place for the GBRf Gala Weekend
UPDATED TIMETABLE AVAILABLE NOW! GB Railfreight and the Nene Valley Railway are making final preparations for a charity gala weekend on 7-8 September, supported by Modern Railways and our sister title Hornby Magazine - and the latest timetable is now available online to plan your visit.
GWR kicks off Greenford battery trial
FastCharge system being tested in shadow service on Greenford branch
Etches Park gets fit for the future
The arrival of East Midlands Railway’s Aurora bi-modes is not the only driving factor behind upgrades to the Derby depot, reports PHILIP SHERRATT
Connecting the tube
Mobile connectivity is being rolled out across the London Underground and Elizabeth Line – at no cost to London’s taxpayers. PHILIP SHERRATT explains how it is being delivered
From project support to top notch performance
With the Crossrail project effectively completed, MTR Elizabeth line’s top priority is driving up punctuality, as MD MIKE BAGSHAW tells PHILIP SHERRATT
Building on the success of the Elizabeth Line
With a full timetable now up and running, TfL’s Elizabeth Line Director HOWARD SMITH tells PHILIP SHERRATT what is next for London’s new railway
Darlington’s anniversary upgrade
New platforms and a new station building are due to be in place for the 200th anniversary of the Stockton and Darlington Railway in 2025
GWR seeks opportunities to grow
Managing Director MARK HOPWOOD tells PHILIP SHERRATT there is plenty of potential to increase rail’s economic contribution