
Level crossing abolished: unit No 313204 passes over the now-closed crossing at Newhaven Harbour on 25 February 2019; vehicles are now diverted via Beach Road crossing instead. John Vaughan
A digest of the main changes on Network Rail, London Underground and Northern Ireland Railways infrastructure during August 2019; compiled by Martyn Brailsford of the Branch Line Society (www.branchline.uk).
August has been very quiet, with the only items of note being the transfer of control of a significant part of King’s Cross PSB to York ROC and the reopening of the line been Aberdeen and Inverurie as a double track line.