Articles from the latest issue in digital format
Passenger revenue recovery stabilising
■ Revenue now consistently just under £10.5bn a year
■ Long-distance travel leads recovery
■ Elizabeth Line success distorting data
Etches Park gets fit for the future
The arrival of East Midlands Railway’s Aurora bi-modes is not the only driving factor behind upgrades to the Derby depot, reports PHILIP SHERRATT
PHILIP SHERRATTBuilding on the success of the Elizabeth Line
With a full timetable now up and running, TfL’s Elizabeth Line Director HOWARD SMITH tells PHILIP SHERRATT what is next for London’s new railway
PHILIP SHERRATTConnecting the tube
Mobile connectivity is being rolled out across the London Underground and Elizabeth Line – at no cost to London’s taxpayers. PHILIP SHERRATT explains how it is being delivered
PHILIP SHERRATTHas signalling lost the plot?
■ Specifications still in ‘NR credit card’ mode
■ ORR competition addiction out of touch with reality
■ ‘ETCS-ready’ trains face obsolescence
Crossing the divide
An initiative between Network Rail and Arriva Rail London is providing their Operations Directors with direct experience of each other’s roles. ANDY RODEN speaks to GUNNAR LINDAHL and MATT POCOCK to discover how the railway could benefit
Andy RodenFrom project support to top notch performance
With the Crossrail project effectively completed, MTR Elizabeth line’s top priority is driving up punctuality, as MD MIKE BAGSHAW tells PHILIP SHERRATT
PHILIP SHERRATT