High Speed 2

News Premium

Design approved for HS2’s Small Dean viaduct

Andy Roden

Double composite approach used for girders

Andy Roden
News Premium

Mission complete! HS2’s first twin-bore tunnel is bored

Andy Roden

Breakthrough at Long Itchington Wood

Andy Roden
News Premium

Rethink for HS2 Euston station as costs soar to £4.8bn

Andy Roden

National Audit office calls for rethink on plans

Andy Roden
News Premium

MML electrification could be shelved to pay for HS2

PHILIP SHERRATT

Wires to Nottingham/Sheffield at risk of cancellation

PHILIP SHERRATT
News Premium

HS2 ‘rephased’ due to cost challenges

PHILIP SHERRATT

Southern and northern ends to be delayed

PHILIP SHERRATT
News Premium

Knives out for HS2

PHILIP SHERRATT

Further cuts threatened

PHILIP SHERRATT

HS2 Washwood Heath depot gains approval

Andy Roden

Train maintenance and network control based at new hub

Andy Roden

HS2 starts London tunnel drive

Andy Roden

Work starts on first of three tunnels

Andy Roden

HS2 nears 25,000 jobs milestone

High Speed 2's workforce is increasing as construction of the new railway ramps up.

News Premium

HS2’s first London TBMs arrive

The first of six TBMs have arrived in London to bore HS2 tunnels.