High Speed 2

Alstom-Hitachi to build £2bn HS2 train fleet

Alstom and Hitachi have won the contract to build 54 trains for High Speed 2.

HS2 Chief Executive Mark Thurston starts boring of the one-mile-long Long Itchington Wood Tunnel on High Speed 2. News Premium

HS2 starts Long Itchington tunnelling

Tunnel boring has started on High Speed 2's Long Itchington Wood tunnel.

News Premium

Northern leaders try to keep NPR schemes alive

Transport for the North is seeking an urgent meeting with the Government to discuss ways of delivering the full Northern Powerhouse Rail programme.

News Premium

Construction starts on Old Oak station box

Construction has begun on Old Oak Common station's box structure for High Speed 2.

News Premium

Integrated Rail Plan axes full HS2 network

The Integrated Rail Plan is axing the full High Speed 2 scheme, but electrification of the Midland main line to Sheffield is promised. PHILIP SHERRATT

London Euston station. The HS2 station left of the existing building is being cut back to 10 platforms. News Premium

HS2 Euston station cut to 10 platforms says Stephenson

High Speed 2's London Euston station is being cut from 11 to 10 platforms.

News Premium

HS2 shortlists more Phase 2a bidders

Three bidders have been shortlisted to lead the design and delivery of HS2 Phase 2a.

News Premium

Hartlepool to build Old Oak tunnel segments

Segments for HS2's twin-bore tunnel from Old Oak Common to Green Parkway are to be made at a new facility in Hartlepool.